ENP Services did a startup on a Square D 8000 Power Meter. Used a Megger Mprt 8445. Injecting current through the Current Transformer CT shorting block at the ATS. Then injecting voltage into the three phase voltage wires. Then using a Megger MS-2 injected 50 amps through the transformer to see it match on the meter screen.
When it’s time to upgrade or replace aging equipment, Our Modernization Solutions sustain your existing gear by upgrading components matching current technologies.
BCS Switchgear tests equipment ensuring your gear meets manufacturer, PEARL, NETA and other industry standards.We calibrate equipment for accurate reading.
We know when needing a part for an obsolete or current manufacture breaker, you need the right part and you need it now. Most parts can be shipped in the same day from our stock.
We buy and sell equipment. Our experience allows us to confidently buy large lots resulting from plant closures and auctions. New and surplus in factory condition.
Contributor: Travis Langer, Field Service Technician at Engineered Power Field Services | contact: [email protected]
Please fill out the appropriate information below.