The purpose was to stress test the insulation by applying voltage to the DUT well above the normal operating voltage.

Contributor: Travis Langer, Field Service Technician at Engineered Power Field Services | contact: travis@bcsswitchgear.com
September 21, 2020 by Travis Langer
The purpose was to stress test the insulation by applying voltage to the DUT well above the normal operating voltage.

Contributor: Travis Langer, Field Service Technician at Engineered Power Field Services | contact: travis@bcsswitchgear.com